Initial capital used for percentage calculations $††††††††††††† 50,000.00 System1 System2 System3 System4 System5 System6 System7 System8 System9 System10
slippage and commision added ontop of ts report $†††††††††† -††                    
BounceES@ES.D Bounce@FDAX Bounce@EMD.D Bounce@EMD.D-lt BounceERv3 BounceER2v3-lt TurboEliteES TriendfriendER Breakout.@ES.D Breakout.@ER2.D
Slippage and commision used in ts report $†††††††††††††††††††††††††††††† -†† $††††††††††††††††† 30.00 $††††††††††††††† 30.00 $†††††††††††††††††††††† 30.00 $†††††††††††††††† -†† $††††††††††††††††† 30.00 $†††††††††††††††††††† -†† $††††††††††††††††††††† 30.00 $†††††††††††††† 25.00 $††††††††††††††† 30.00
Additional slippage and commision added 25 $†††††††††††††††††††††† -†† $†††††††††††††††††††† -†† $††††††††††††††††††††††††††† -†† $†††††††††††††††† -†† $†††††††††††††††††††††† -†† $†††††††††††††††††††† -†† $†††††††††††††††††††††††††† -†† $††††††††††††††††††† -†† $†††††††††††††††††††† -††
Total Slippage and commisions $††††††††††††††††††††††††† 25.00 $††††††††††††††††† 30.00 $††††††††††††††† 30.00 $†††††††††††††††††††††† 30.00 $†††††††††††††††† -†† $††††††††††††††††† 30.00 $†††††††††††††††††††† -†† $††††††††††††††††††††† 30.00 $†††††††††††††† 25.00 $††††††††††††††† 30.00
number of contracts on each system 1 1 1 1 1 1 0 0 0 0
If a "1" in in the fields above (in green) the system is selected. If itís a "0" then its not selected, and taken out of the results table  
Any amount here will be added to slippage and commision r/t in the tradestation report  
First date of sums 2/2/2002
Last dates trades occurs 5/21/2007
password for locked cells is pz